Statistics:
- Length:
- 228 km
- Termini:
- Eastern: Landing Rd (unnumbered) and Hinemoa St (unnumbered), Whakatāne
- Western: SH3, Te Kūiti
- Miscellaneous:
- Route includes: Waitete Road, Ellis Road, Scott Road, Mitchell Road, Whakamaru Road, Ongaroto Road, Hemo Road, Sala Street, Te Ngae Road and Hongis Track
- Suburbs, Towns & Localities Along Route:
- Te Kūiti, Benneydale, Whakamaru, Mangakino, Whakamaru, Ātiamuri, Upper Ātiamuri, Whakarewarewa, Rotorua, Te Ngae, Lynmore, Lake Ōkataina, Lake Rotoehu, Lake Rotomā, Kawerau, Te Teko, Awakeri, Pāroa and Whakatāne
Route Numbering:
- Current:
- Former:
- Multiplexed with:
General Information:
Linking the Waikato region and Bay of Plenty region on New Zealand' North Island, State Highway 30 is one of 2 key routes between Rotorua and Tauranga and is the key heavy vehicle route for freight. 1 SH30 is also popular with tourists accessing tourist attractions dotted along the route. State Highway 30 passes through rugged terrain, forests, rural / farmland areas, residential, commercial and industrial zones.
Multiplexes along the route include:
- SH1, for 6 km, between Ātiamuri and Upper Ātiamuri
- SH2, for 1 km, at Awakeri
- SH5, for 1 km, at Rotorua
- SH32, for 1 km, at Whakamaru
- SH34, for 220 m, at Putauaki
- Thermal Explorer Highway, for 1 km, at Rotorua
- Pacific Coast Highway, for 4 km, between Paroa and Whakatāne
History:
- July 2013: Rock face stabilisation works along a 400 metre-long section on SH30 at Ruato Bay. The work involved drilling and bolting the rock columns together, and then covering the rock face with a steel wire mesh. 2
- 18 February 2020: Work commenced on road upgrades along Te Ngae Road in Lynmore. Works included the upgrade of the Tarawera roundabout to a signalised intersection and the four-laning of a section of the highway between Allen Mills and Iles roads, 3.5 km of new shared paths, overhead powerlines relocated underground, and installation of new water mains. 3
- 28 September 2020: Work commenced on replacement of the timber deck on the one-lane bridge over the Mōkau River. 4
- 27 January 2021: Shoulder widening and sealing works on State Highway 30 in Kapenga between Bryce Road and the intersection with State Highway 5. 5
- February 2021: Work started on strengthening and rebuilding three sections of road between Nicholson Road and State Highway 1 at Ātiamuri. 6
- 23 July 2021: Activation of traffic signals at the corner of Te Ngae Road (SH30), Marino Road and Tarawera Road. 7
- 25 July 2021: Work commenced on widening the footpath on the southern side of the Puarenga Bridge to join with the shared path at either end of the bridge. 8
- February 2022: Stage 1 of an upgrade project was completed from Sala Street to Iles Road. 9
- July 2022: Culvert replacement and surface repairs between Te Kūiti and Kōpaki Road, Kōpaki. 10
- 03 October 2022: Speed limits changed through Rotorua, Whakarewarewa, Ngāpuna and Lynmore. 11
- 2022: Upgrade work commenced on intersection improvements and upgrades to four lanes from Iles Road to Basley Road. The work included wider shared paths and on-road cycle lanes. 9
- November 2023: Completion of a new roundabout at the SH30 / SH33 intersection (Te Ngae Junction) and a right-turn lane at the corner of SH30 and Rangiteaorere Road intersection in Tikitere. 12
- February 2025: Work commenced on intersection upgrades including installation of traffic signals at the corner of Te Ngae Road (SH30) and Wharenui Road, Ōwhata. 9
- August 2025: Activation of traffic signals at the corner of Te Ngae Road (SH30) and Wharenui Road, Ōwhata. 1
Click or tap the map to enable panning and zooming
Intersection Direction Sign:
AD sign at Te Kūiti, approaching Rora St and Lawrence St, March 2025.
Image © Krysten Pratt
Advance Direction Sign:
AD sign near Waipa River at Ōtorohanga, approaching Te Kānawa St (SH39), March 2025.
Image © Krysten Pratt
1 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, Projects, New traffic lights on Rotorua’s SH30 - drive with care, 18 August 2025.
2 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, State Highway 30 (SH30) at Ruato Bay repairs to start next month. 06 June 2013.
3 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, Construction of $17M roading project in Rotorua starts next month, 22 January 2020.
4 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, SH30 south of Te Kūiti closed until 9 October, 28 September 2020.
5 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, Shoulder widening works start today on SH30 Kapenga, 27 January 2021.
6 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, Repair works on SH30 at Ātiamuri start next week, 17 February 2021.
7 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, Signalised intersection at State Highway 30 / Tarawera Road intersection scheduled to be operational on Friday 23 July, 22 July 2021.
8 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, SH30 Rotorua works for week beginning Sun 25 July, 23 July 2021.
9 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, Waikato & Bay of Plenty state highway works March 2025, 14 March 2025.
10 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, Projects, Repairs scheduled for State Highway 30 in Kōpaki, 25 July 2022.
11 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, Projects, SH5 / SH30 Rotorua new permanent speed limits.
12 NZ Government (Te Kāwanatanga o Aotearoa), New Zealand Transport Agency (Waka Kotahi), Media Releases, Roundabout replaces T-junction for a safer intersection, 09 November 2023.