Statistics:

Length:
57 km
Termini:
Eastern: Western Dist (unnumbered) and Bathurst St (unnumbered), Pyrmont
Western: Great Western Hwy (NR32) and Governors Dr (unnumbered), Lapstone
Suburbs, Towns & Localities Along Route:
Lapstone, Glenbrook, Leonay, Jamisontown, Regentville, South Penrith, Glenmore Park, Orchard Hills, Claremont Meadows, St Marys, Colyton, St Clair, Erskine Park, Eastern Creek, Prospect, Girraween, Pemulwuy, Greystanes, South Wentworthville, Mays Hill, Merrylands, Holroyd, Granville, Clyde, Auburn, Lidcombe, Homebush West, Homebush, Concord, Canada Bay, Five Dock, Haberfield, Lilyfield, Leichhardt, Rozelle and Pyrmont

Route Numbering:

Current: M4 A44
Former: 4 32 F4
Multiplexed with: 40
Road Authority Internal Classification: 1
HW5 (Concord to Haberfield and Lapstone to Leonay)
6004 (Leonay to Concord)
MR165 (Rozelle to Pyrmont)
MR650 (Haberfield to Rozelle)

General Information:

Metroad 4 is the main route between the Blue Mountains and Sydney's western suburbs and Sydney's CBD. Except within the inner western suburbs of Sydney, the route parellels and in some cases uses one Australia's earliest road routes, Parramatta Road / Great Western Highway.

Road conditions vary from freeway standard through to suburban arterial road. With a minimum of 2 lanes in each direction.

Western Motorway:

Planning began for the Western Expressway in 1947, as the County of Cumberland Planning Scheme (CCPS) was being drawn up, which included a corridor from the City of Sydney at Glebe to the Gt Western Hwy at Lapstone, passing through Glebe, Haberfield, and Five Dock before joining the current route at Concord. This corridor was reserved in 1951. 1

The first section of the M4 Motorway was from Prospect to Penrith, completed by the NSW Government in the early 1970s. Various stages of the second section from Concord to Parramatta were completed during the 80s, with a missing link of approximately 10 km between Mays Hill, near Parramatta, and Prospect to connect these two sections. 1

In 1989 the NSW Government invited proposals from private enterprise to fund and construct the missing section of roadway, and upgrading a further 11 km of the F4 Freeway. Statewide Roads Limited (SWR) won the right over a 20 year period to finance and build, and then operate and maintain the Motorway, after which the Motorway reverted back to Government control at no cost. 2

The opening of the M4 Western Motorway in May 1992 included 21 major bridge structures, and the upgrade and widening of 11 kilometres of existing expressway at a cost of $245 million. The completion of this section provided uninterrupted motorway conditions between Concord and Lapstone on the foothills of the Blue Mountains. Between 1996 to 1998 an upgrade and widening of the M4 Western Motorway to 3 lanes each way from Parramatta to Penrith was completed. 2

ANZAC Bridge:

The ANZAC Bridge opened in 1995 and was formerly the Glebe Island Bridge. (ANZAC stands for Australian and New Zealand Army Corps). 2

The bridge is the longest cable-stayed bridge in Australia, with a main deck length of 805 metres, including a 345 metre span between the towers. The two 128 metre towers support 128 cables, and is eight lanes wide. 2

On Remembrance Day, 11 November 1998, the New South Wales Government bestowed the bridge to the NSW Returned Serviceman's League for re-naming as 'The Anzac Bridge' and unveiled a monument of a digger bowed in silent reflection. The monument is located at the western end of the bridge on the northern side. A second bronze statue, of a New Zealand digger, followed on the southern side in April 2008. 2

A handful of sand from Gallipoli rests under the foot of the digger as a permanent connection with comrades who fell and remain at the Gallipoli Battlefield in Turkey. 2

Western Distributor:

The Western Distributor is a network of motorway feeder roads linking the Sydney Harbour Bridge, Sydney CBD, Cross City Tunnel to the main arterial roads to the Western suburbs of Sydney, such as Parramatta Road (via City West Link) and Victoria Road (SR40).

When it was built, it was intended to be the southern end of the F3 Freeway, as it was where the North West Freeway was planned to finish, however due to protests from inner city residents, this plan never came to fruition. The Western Distributor was opened in stages starting in September 1972 1

Multiplexes along the route include:
State Route 40, for 2 km, between Rozelle and Pyrmont.

History:

11 October 1971: The first section of the Western Motorway, a small three mile section near the Nepean River at Regentville, opened. This included Regentville Bridge across Nepean River. 2
20 December 1972: A further nine-mile section of the Western Motorway opened. It was also the first state road to have the new maximum speed limit of 110 km per hour. 2
2 September 1972: The Western Distributor was opened in stages from this date, until February 1973. 1
August 7 1981: The 'Pyrmont Flyover' section of the Western Distributor opened.
December 1982: Western Motorway from Concord to Melton Street Auburn was opened, it included a cable-stayed pedestrian bridge across the road at Pomeroy Street, Homebush, the first such bridge built by the DMR. 2
May 1992: The opening of the missing link in the Western Motorway between Mays Hill and Blacktown. This included 21 major bridge structures, and the upgrade and widening of 11 kilometres of existing expressway at a cost of $245 million. The completion of this section provided uninterrupted motorway conditions between Concord and Lapstone on the foothills of the Blue Mountains.
3 December 1995: The ANZAC Bridge, originally named Glebe Island Bridge was opened by the Premier of New South Wales, The Hon. Bob Carr MP. 2
1996: Commencement of an upgrade and widening of the M4 Western Motorway to 3 lanes each way from Parramatta to Penrith. This was completed in 1998.
11 November 1998: On Remembrance Day, the New South Wales Government bestowed the bridge to the NSW Returned Serviceman's League for re-naming as 'The ANZAC Bridge' and unveiled a monument of a digger bowed in silent reflection. The monument is located at the western end of the bridge on the northern side. A second bronze statue, of a New Zealand digger, followed on the southern side in April 2008. 2
14 December 1998: M4 widening to 6 lanes project opened by then Premier Bob Carr.3
2013: Metroad 4 decommissioned.
Click or tap the map to enable panning and zooming
1 Sam Laybutt (Ozroads).
2 NSW Government, Roads and Traffic Authority.
3 Tyler Bullock.